Hyperscale Pilot Scope
Exactly what is in pilot, what is demo-only, and what is intentionally out of scope. Published so partners know — clearly — what they are getting.
Included in Pilot
In production use during pilot, on a real hyperscale campus.
Digital Twin (3D / Spatial)
Zone hierarchy, asset mapping, navigation, multi-overlay views.
Workflow & Task Engine
Lifecycle, dependencies, blocking, zone-linked tasks, trade conflict detection.
Engineering Markups
Notes, issues, RFIs, redlines, approvals, dimensions, version tracking.
Mobile Field Capture
Geo-tagged photos, custom forms, daily reports, issue & safety logs.
Project Dashboards & Reports
KPIs, activity feeds, exportable reports, real-time analytics.
Collaboration
Comments, mentions, role-based notifications, full activity logs.
Roles & Permissions
Owner / Admin / PM / Engineer / Field Supervisor / Technician / Viewer.
File & Document Management
Upload, versioning, linking to tasks/zones/assets, access control.
Demo Only
Available to show in environments and previews — not part of pilot SLAs.
Advanced CAD / DXF / DWG
Drawing, snapping, measurement available; full DXF/DWG round-trip is demo-only during pilot.
External GIS Data Integration
GeoJSON + MapLibre overlays present; rich third-party feeds shown as demo only.
AI Insights
Early AI features (conflict prediction, safety detection) are demoed against sample data — not in production scope.
Excluded from Pilot
Intentionally out of scope. Discussed openly so nothing is overpromised.
Procurement, Budgeting & Cost
Targeted for enterprise rollout post-pilot.
Vendor Management
Out of pilot scope.
Multi-Org Tenancy & White-Label
Pilot runs as a dedicated tenant per partner.
Production AI / ML Pipelines
No live AI decisioning in pilot. Conflict prediction & CV safety models remain post-pilot.
External ERP / Scheduler Sync
Bi-directional integrations (e.g. P6 / ERP) are post-pilot work.
Marketplace / SDK / Public API
Long-term vision, explicitly out of pilot.
Known Gaps (Closing Pre-Pilot)
Surfaced in internal audit. These are the priorities before any pilot starts.
Security
Active hardening — critical fixes are the #1 priority before pilot launch.
Data Integrity
Background validation, repair tooling, and stricter schema enforcement in flight.
Mobile Polish
Field UX improvements, offline edge cases, and tablet-first layouts being closed out.
Observability
Centralized logging, error tracking, and SLO metrics being expanded for pilot.
Workflow Validation
Edge cases in task lifecycle, blocking logic, and assignment rules being tightened.
90-Day Build Priorities
Tightly scoped. Three lanes, no scope creep.
Critical Fixes
- Security hardening
- Data integrity layer
- Observability + alerting
High-Priority Features
- Mobile field polish
- Workflow UX + validation
- Engineering overlay wiring
Pilot-Only Scope
- Single-tenant deployment
- Dedicated success engineering
- Tight feedback loop with one hyperscale partner
Running a hyperscale program?
Pilot is by invitation. Submit an enterprise inquiry and we'll evaluate fit, scope a campus, and walk through the architecture together.