Platform & Feature Status

The actual state of the Opsirion platform β€” by pillar, by feature, with honest status. Built for hyperscale data center construction and scoped against a real pilot.

Core Pillars

The six functional pillars in the platform today, each with current status.

πŸ›°οΈ

Digital Twin (3D / Spatial Layer)

3D project visualization with zone-based structure β€” site β†’ building β†’ floor β†’ room β€” plus asset mapping, navigation, and multi-overlay views (engineering, safety, workflows).

Partial β€” Pilot Ready
🧭

Workflow & Task Engine

Zone-linked tasks with full lifecycle (planned β†’ ready β†’ in progress β†’ complete), trade dependencies, blocking logic, and conflict detection across overlapping crews.

Functional
πŸ“

Engineering Suite

Version-controlled design overlays with notes, issues, RFIs, redlines, approvals, and dimensioning. CAD/PDF upload with trade filtering and revision tracking.

Partial β€” In Wiring
πŸ“±

Field Operations

Mobile-first data capture for crews β€” geo-tagged photos, custom forms, daily reports, issue logs, and safety incidents β€” all bound to the spatial model.

Partial β€” Mobile Polish
πŸ“Š

Data & Reporting

Project dashboards, real-time activity feeds, KPI tracking, and exportable reports β€” turning every field event into program-level intelligence.

Functional
🀝

Collaboration Layer

Cross-team coordination with comments, mentions, role-based notifications, and full activity logs across the platform β€” so PMs, engineers, and field stay aligned.

Functional

Honest Feature Status

What is actually built, what is partial, what is hardening, and what is planned. No marketing inflation β€” this is the same view our internal audit uses.

FunctionalPartialHardeningPlanned
FeatureStatusNotes
Digital Twin (3D / Spatial)PartialCore in place. Performance + stability under hyperscale-zone load is the priority.
Workflow & Task EngineFunctionalLifecycle, dependencies, and zone linkage live. UX + validation polish in flight.
Engineering SuitePartialMarkups, RFIs, redlines, version tracking working. Full wiring across overlays in progress.
Field Operations (Mobile)PartialCapture, photos, forms, daily reports working. Mobile UX polish before pilot.
Safety & CompliancePartialIncident tracking + zone hazards in place. Audit trails being expanded.
Asset & Infrastructure TrackingPartialRegistry + location tracking live. Lifecycle / maintenance follow pilot.
Data & ReportingFunctionalDashboards, activity feeds, KPIs, exports working end-to-end.
Roles & PermissionsFunctionalOwner / Admin / PM / Engineer / Supervisor / Tech / Viewer roles in place.
Collaboration (Comments, Mentions)FunctionalCross-team coordination, notifications, and activity logs live.
File & Document ManagementFunctionalUpload / download / versioning / linking to tasks, zones, and assets.
Map & GIS LayerPartialGeoJSON + MapLibre integration in. Deeper external data integration planned.
CAD / Design ToolsPartialDrawing, measurement, snapping in progress. DXF/DWG export targeted post-pilot.
SecurityHardeningActive hardening. Critical fixes are the #1 priority before pilot launch.
Observability & LogsHardeningCentralized logging, error tracking, and metrics being expanded.
AI / AutomationPlannedConflict prediction, workflow optimization, and CV safety detection are post-pilot.
Financial / ProcurementPlannedProcurement, budgeting, cost, and vendor management targeted for enterprise rollout.

Complete Build Roadmap

From pilot hardening to long-term AI. Every phase is scoped against the realities of hyperscale construction β€” and against an honest internal audit of what is built, what is partial, and what is planned.

πŸ› οΈ Active Build

Now β€” Q2 2026 β€” Pilot Hardening

Closing critical gaps surfaced in audit: security, data integrity, observability, and mobile polish. Stabilizing the Digital Twin and Workflow Engine for a real hyperscale campus.

πŸ”IN BUILD

Security Hardening

πŸ›°οΈIN BUILD

Digital Twin Stability

πŸ“±HARDENING

Mobile Field Polish

🧭HARDENING

Workflow Validation & UX

πŸ“‘HARDENING

Observability & Logs

🧱HARDENING

Data Integrity Layer

πŸš€ Pilot Launch

Q3 2026 β€” First Hyperscale Pilot

Limited deployment with a single hyperscale partner. Core platform in production use across one campus: spatial model, workflow execution, engineering markups, field capture, dashboards.

πŸ›°οΈPILOT SCOPE

Digital Twin (3D / Spatial)

🧭PILOT SCOPE

Workflow & Task Engine

πŸ“PILOT SCOPE

Engineering Markups & RFIs

πŸ“±PILOT SCOPE

Mobile Field Capture

πŸ“ŠPILOT SCOPE

Project Dashboards & Reports

🀝PILOT SCOPE

Collaboration & Notifications

πŸ“ Engineering Depth

Q4 2026 β€” Q1 2027 β€” Pilot Expansion

Deeper engineering tooling and GIS layer. Expanding to additional pilot programs and additional trades on the same campus.

πŸ“PLANNED

CAD / DXF / DWG Round-Trip

πŸ“PLANNED

Snapping & Measurement Tools

πŸ—ΊοΈPLANNED

GeoJSON / MapLibre Overlays

πŸ“…PLANNED

Schedule Integration

πŸ“¦PLANNED

Asset Lifecycle Tracking

βœ…PLANNED

Compliance Forms & Audits

🏒 Enterprise Rollout

2027 β€” Multi-Program Scale

Multi-org tenancy, audit trails, role tiering, and enterprise systems for owner-operators and EPCs running multiple hyperscale programs in parallel.

🏒PLANNED

Multi-Org Tenancy

πŸ”‘PLANNED

Role & Permission Tiering

🧾PLANNED

Procurement Tracking

πŸ’°PLANNED

Cost & Budget Management

🀝PLANNED

Vendor Management

🏷️PLANNED

White-Label Deployment

🧠 AI / Automation

2027+ β€” Long-Term Vision

Intelligence layer on top of the spatial source of truth β€” predicting trade conflicts, optimizing workflow sequencing, and surfacing safety risk from field imagery.

🧠PLANNED

Conflict Prediction

βš™οΈPLANNED

Workflow Optimization

🦺PLANNED

Safety Detection (Computer Vision)

πŸ“ˆPLANNED

Program-Level Data Insights

πŸ”ŒPLANNED

External Data Integration

πŸ›’PLANNED

Marketplace / SDK

Helping Shape the First Hyperscale Pilot?

Pilot slots are deliberately limited. If you run a hyperscale program β€” owner, GC, or EPC β€” we want to talk.