Platform & Feature Status
The actual state of the Opsirion platform β by pillar, by feature, with honest status. Built for hyperscale data center construction and scoped against a real pilot.
Core Pillars
The six functional pillars in the platform today, each with current status.
Digital Twin (3D / Spatial Layer)
3D project visualization with zone-based structure β site β building β floor β room β plus asset mapping, navigation, and multi-overlay views (engineering, safety, workflows).
Partial β Pilot ReadyWorkflow & Task Engine
Zone-linked tasks with full lifecycle (planned β ready β in progress β complete), trade dependencies, blocking logic, and conflict detection across overlapping crews.
FunctionalEngineering Suite
Version-controlled design overlays with notes, issues, RFIs, redlines, approvals, and dimensioning. CAD/PDF upload with trade filtering and revision tracking.
Partial β In WiringField Operations
Mobile-first data capture for crews β geo-tagged photos, custom forms, daily reports, issue logs, and safety incidents β all bound to the spatial model.
Partial β Mobile PolishData & Reporting
Project dashboards, real-time activity feeds, KPI tracking, and exportable reports β turning every field event into program-level intelligence.
FunctionalCollaboration Layer
Cross-team coordination with comments, mentions, role-based notifications, and full activity logs across the platform β so PMs, engineers, and field stay aligned.
FunctionalHonest Feature Status
What is actually built, what is partial, what is hardening, and what is planned. No marketing inflation β this is the same view our internal audit uses.
| Feature | Status | Notes |
|---|---|---|
| Digital Twin (3D / Spatial) | Partial | Core in place. Performance + stability under hyperscale-zone load is the priority. |
| Workflow & Task Engine | Functional | Lifecycle, dependencies, and zone linkage live. UX + validation polish in flight. |
| Engineering Suite | Partial | Markups, RFIs, redlines, version tracking working. Full wiring across overlays in progress. |
| Field Operations (Mobile) | Partial | Capture, photos, forms, daily reports working. Mobile UX polish before pilot. |
| Safety & Compliance | Partial | Incident tracking + zone hazards in place. Audit trails being expanded. |
| Asset & Infrastructure Tracking | Partial | Registry + location tracking live. Lifecycle / maintenance follow pilot. |
| Data & Reporting | Functional | Dashboards, activity feeds, KPIs, exports working end-to-end. |
| Roles & Permissions | Functional | Owner / Admin / PM / Engineer / Supervisor / Tech / Viewer roles in place. |
| Collaboration (Comments, Mentions) | Functional | Cross-team coordination, notifications, and activity logs live. |
| File & Document Management | Functional | Upload / download / versioning / linking to tasks, zones, and assets. |
| Map & GIS Layer | Partial | GeoJSON + MapLibre integration in. Deeper external data integration planned. |
| CAD / Design Tools | Partial | Drawing, measurement, snapping in progress. DXF/DWG export targeted post-pilot. |
| Security | Hardening | Active hardening. Critical fixes are the #1 priority before pilot launch. |
| Observability & Logs | Hardening | Centralized logging, error tracking, and metrics being expanded. |
| AI / Automation | Planned | Conflict prediction, workflow optimization, and CV safety detection are post-pilot. |
| Financial / Procurement | Planned | Procurement, budgeting, cost, and vendor management targeted for enterprise rollout. |
Complete Build Roadmap
From pilot hardening to long-term AI. Every phase is scoped against the realities of hyperscale construction β and against an honest internal audit of what is built, what is partial, and what is planned.
Now β Q2 2026 β Pilot Hardening
Closing critical gaps surfaced in audit: security, data integrity, observability, and mobile polish. Stabilizing the Digital Twin and Workflow Engine for a real hyperscale campus.
Security Hardening
Digital Twin Stability
Mobile Field Polish
Workflow Validation & UX
Observability & Logs
Data Integrity Layer
Q3 2026 β First Hyperscale Pilot
Limited deployment with a single hyperscale partner. Core platform in production use across one campus: spatial model, workflow execution, engineering markups, field capture, dashboards.
Digital Twin (3D / Spatial)
Workflow & Task Engine
Engineering Markups & RFIs
Mobile Field Capture
Project Dashboards & Reports
Collaboration & Notifications
Q4 2026 β Q1 2027 β Pilot Expansion
Deeper engineering tooling and GIS layer. Expanding to additional pilot programs and additional trades on the same campus.
CAD / DXF / DWG Round-Trip
Snapping & Measurement Tools
GeoJSON / MapLibre Overlays
Schedule Integration
Asset Lifecycle Tracking
Compliance Forms & Audits
2027 β Multi-Program Scale
Multi-org tenancy, audit trails, role tiering, and enterprise systems for owner-operators and EPCs running multiple hyperscale programs in parallel.
Multi-Org Tenancy
Role & Permission Tiering
Procurement Tracking
Cost & Budget Management
Vendor Management
White-Label Deployment
2027+ β Long-Term Vision
Intelligence layer on top of the spatial source of truth β predicting trade conflicts, optimizing workflow sequencing, and surfacing safety risk from field imagery.
Conflict Prediction
Workflow Optimization
Safety Detection (Computer Vision)
Program-Level Data Insights
External Data Integration
Marketplace / SDK
Helping Shape the First Hyperscale Pilot?
Pilot slots are deliberately limited. If you run a hyperscale program β owner, GC, or EPC β we want to talk.